- Overview
- Terminals
- ETT, Rotterdam
- ETA, Amsterdam
- ATPC, Antwerp
- VNT, Latvia
- BNK, Russia
- FRCL, United Arab Emirates
- VTT Port Qasim, Pakistan
- Vitco, Argentina
- Navgas, Nigeria
- Seaport Canaveral, USA
- Projects
- Pipelines
ETT3, Rotterdam, Netherlands
| Terminal name |
EuroTank Terminal B.V. |
| Port |
Port of Rotterdam |
| Ownership |
100% Vitol |
| Address |
|
| Street |
Moezelweg 151 |
| City |
Europoort-Rotterdam |
| Country |
The Netherlands |
| Zip code |
3198LS |
| Phone |
+31(0) 181240024 |
| Fax |
+31(0) 181240010 |
| Email |
- |
| Harbour no. |
5610 |
| Website (Terminal) |
www.vtti.com |
| Website (Port) |
www.portofrotterdam.com |
| Project manager |
|
| Name |
Arjen Schneiders |
| Phone |
+31(0) 181240021 |
| Email |
asn@ett.vtti.com |
| Tank capacity |
|
| New tank capacity 2011 |
465,000 cbm |
| New tanks 2011 |
10 |
| Type tank |
|
| Mild steel |
Y |
| Mild steel coated |
Y |
| Mild steel insulated |
N |
| Stainless steel |
N |
| Concrete |
N |
| Sphere |
N |
| Classication tanks |
K1 |
Flash point: K1 < 21˚C; K2 21-55˚ C; K3 >55˚C
| Accessibility |
|
| Seagoing vessel>180m |
Y |
| Coaster |
Y |
| Barge |
Y |
| Road |
tbd |
| Rail |
tbd |
| Pipeline to other sites |
Y |
| Other |
- |
| Jetties |
|
| Number of jetties |
4 |
| Maximum draft * |
21 m |
| Maximum length |
360 m |
| Maximum width |
60 m |
| Classification jetties ** |
K1 |
*For information only. Contact local port authority for detailed information.
**Flash point: K1 < 21˚C; K2 21-55˚ C; K3 >55˚C
Product scope *** Minerals |
|
| Crude |
N |
| Gasoline |
Y |
| Jetfuel |
Y |
| Kerosone |
Y |
| Naphtha |
Y |
| Gasoil |
Y |
| Diesel |
Y |
| LPG |
N |
| Fuel Oil |
N |
| VGO |
Y |
| Others |
- |
| Chemicals |
|
| Petrochemicals |
Y |
| Acids |
N |
| Base |
N |
| Solvents |
Y |
| Lubricants |
N |
| Alcohols |
Y |
| Others |
- |
| Vegoils |
|
| Palm oil |
N |
| Soy oil |
N |
| Molasse |
N |
| Oleochemical |
N |
| Methylesters |
Y |
| Others |
- |
***The above stated product list is an indication, however not exclusive.
Overview:
The land for this ETT3 project adjoins our ETT1 and ETT2 sites. On completion, the three sites will give us storage capacity in excess of one million m3 in one of the world’s busiest ports.
Currently, the ETT3 plot is free from above ground structures and remediation of the soil has been concluded. The EPC contract for ETT3 has been awarded and the site preparation activities started. Currently the excavation work for the tank foundation takes place to check / verify the location of the existing piles. The environmental permit is in the final stage of being approved and the construction permit application has been issued. The ETT3 terminal will have a storage capacity of 465,000 m3 for K1 products. We expect additional synergies with a proposed pipeline linking ETT to Antwerp, at Rotterdam Port.
Video content unavailable: Flash Required.
Latest news:
8th April 2009
ETT3, Rotterdam
Getting busy, at Europe’s busiest port
With the successful completion of the ETT2 project in Rotterdam, the focus has moved to the neighbouring ETT3 site.
Read story
Latest vacancy:
24th February 2010
ETT3, Rotterdam
Operator
The operator performs operational work relating to unloading and loading of sea-going vessels, barges, product pumping via pipelines, the storage and handling of products, the management of the tank farm and cleaning work so that, with due regard for the environmental and safety requirements / instructions, a fast and efficient service is provided both internally and externally.
More information